Renewing a historic road, to deal with heavy loads! No problem with a Roadmaster!
In 1851 the residents of North Yell set to work on the Gutcher to Cullivoe Road (B9082). The project was commissioned by the Highlands Destitution Relief Board, and the road was built to take the weight of horse and cart traffic. Roll forward to 2019, and this same road, with minimal improvements is now taking the traffic of one of the country’s busiest ports! The Roadmaster Spray Injection Patching unit has been instrumental in keeping this economically essential road; known locally as the Salmon Road, in an operational state of repairs.
Shetlands largest industry is aquaculture and the efficient running of this business underpins the region’s economy. In 2017, Government figures show the total tonnage of whitefish landed at Cullivoe was 3,213 and was valued at £6.3 million. This places Cullivoe among the top twelve landing ports in the UK. According to figures from Shetland Aquaculture and Seafood Shetland; 30,360 tonnes of salmon were landed at Cullivoe valued at £130.5 million; almost half of all the salmon produced in Shetland! This thriving industry has caused a huge growth in the level of traffic being accommodated by this historic road. On average, 7 articulated trucks travel this road daily for the haulage of salmon and whitefish. There is also significant heavy load traffic related to the construction of industry specific infrastructure such as salmon cages. This level of use, which continues to grow, amounts to a total of 3,410 articulated truck movements per year on this single-track road. The Salmon Road supports the entire aquaculture industry in the North Isles.
However, in September 2018 the Roads Service Engineer, Neil Hutcheson for the North Isles expressed concern regarding the deterioration in the condition of the road and the implications this had for road safety, a view that was supported by the Executive Manager for Roads, Dave Coupe.
Following this review, it was found that the widening of the B9082 over its entire length was not a practical or economic option due to the peat soils on which the road was built. The surface of this road has consolidated over the years as it has been trafficked by an increasing number and weight of heavy vehicles. Despite having a very shallow construction, it is able to withstand relatively heavy loading. However, as soon as the surface is disturbed by any excavation through or adjacent to the road it becomes difficult to achieve a consistent reinstatement without disturbing the existing surface. The overlay resurfacing of the road is not an option either. The edge of any resurfacing is not vertical and slopes back from the carriageway edge with a grade of approximately 2 in 1. Therefore, for every 150mm increase in height the road will narrow by 75mm on each side giving a total reduction in width of 150mm. The result being that the narrowest sections of road, that are currently 2.6 metres wide, would be reduced to 2.45 metres in width. This is less than the legal permitted width of 2.55 metres for vehicles specified in “The Road Vehicles (Construction and Use) Regulations 1986” as amended, meaning that HGV’s would be overhanging the road edge.
These challenges and the necessity to keep the road operational, encouraged the Shetlands roads team to look for innovative solutions. Following a competitive tendering competition, the Roadmaster Spray Injection Patching machines were awarded the contract. The work was completed under contract by Archway Roadmaster Ltd in May 2019. The repair work was managed and finished by the Roadmaster team on time and within budget. The successful repairs enabled the B9082 to remain open. Neil Hutcheson, Roads Service Engineer, North Isles was delighted with the quality, consistency and longevity of the repairs and has added the Roadmaster to his arsenal of road maintenance solutions across the North Isle’s on an annual basis. Neil said “Archway Roadmaster Ltd and their spray injection patching machine have made a huge difference to the condition of the Cullivoe Road. The carriageway was in a very poor state and any further deterioration may have required the introduction of a weight limit on the road. This was clearly an outcome that had to be avoided due to the Cullivoe Pier and its importance to Shetland’s aquaculture industry. We needed a cost effective means of repairing the numerous defects along the road. These repairs also had to be done efficiently to minimise delays and disruption to the pier traffic. The Roadmaster met all these requirements with costs and the time taken significantly less than traditional patching by “hand.” I have also been impressed by the quality of the patching resulting in a noticeable improvement when driving along the road. The Roadmaster has now become an additional treatment option that we intend to use throughout Shetland alongside other more traditional options such as surface dressing and resurfacing.”
New ownership and investment on the way for Archway Roadmaster
Archway Roadmaster is under new ownership as road repair specialists Velocity have acquired Archway Roadmaster UK business from Irish parent company, Archway Products. Founded over 25 years ago as...
Run your own Roadmaster® for complete control on road repair & maintenance budgets
The pressure on local authorities to keep road networks safe and in good condition is, like potholes a year-round problem. Motorists and road defects won’t wait for repair. It is a constant headache...
Greener Safer and Quicker pothole & road defect repair and prevention
Greener Safer and Quicker pothole & road defect repair and prevention 3 reasons why Local Authorities are using the Roadmaster® for Road Defect Repair and Prevention? Roadmaster® Spray Injection...
Roadmaster® Repairs Reduce Pothole Complaints in Local Constituencies throughout the year!
Roadmaster® Repairs Reduce Pothole Complaints in Local Constituencies throughout the year! On an average day this summer Roadmasters will repair approximately 500 road defects throughout England...
Archway Roadmaster UK’s Expansion in Scunthorpe brings the service and support closer to the customer
Archway Roadmaster UK’s Expansion in Scunthorpe brings the service and support closer to the customer Despite the challenges 2021 brought, it was a year of continued expansion for...
Health & Safety is the Star of the Show for Archway Roadmsters Start Up Week 2022
To kick off the new season, Archway Roadmaster hosted its annual Start Up Week. Health and safety was the star of the show with a keen focus placed on empowering and training our 30+ strong...
Are you our next Operator / Driver? We are hiring!
Are you our next operator / driver? Looking...
Roadmaster Goes Green – Our Sustainability Journey Begins Here
Across the country, councils are working hard to become carbon neutral. There are ambitious targets between 2030 and 2050 set for different regions. Our city, towns and county councils are looking...
Are you looking for a new career direction?
Are you looking for a new career direction? Are you hardworking, responsible, mechanically minded, hold a Class 1 licence and ready for a challenge? Then we are looking for you! As an Operator...
Archway Roadmaster Online Demo’s – Integration of Traditional Sales and Online Savvy
Archway Roadmaster Online Demo’s - Integration of Traditional Sales and Online Savvy The highways industry across the UK and Ireland is a traditional industry which is key to the efficient running...